Aug 3 – SubFloor Buttoned Up

The Advantech sheathing is installed onto the subfloor joists as well as temp power panel  ready for inspection.

20140803_125225
Been running with a Yamaha inverter generator for a while. Time for some real power….

 

 

20140803_191253
The sub floor completion gets us closer to stacking logs!

Leave a Reply

Your email address will not be published. Required fields are marked *